1965-72 :: see gallery →
Team member of the Tender for a dry-dock in Trieste (Client: Consorzio Autonomo del Porto di Trieste)
Italy | GEI Generale Ingegneria
Team member for the design of a Tanker of capacity 20,000 cu.m. in Siracusa (Client: Cassa per il Mezzogiorno)
Italy | GEI Generale Ingegneria
1973-87 :: see gallery →
Engineering design of the Speculative office block, building of 20 stories and 300.000 cu.m. part of the first phase of Abuja. Principal Architect Kenzo Tange (Client: Federal Capital Development Authority)
Nigeria | ICA/TEAM Group
New Nigerian Railway Network , 202 Km Otukpo – Ajaokuta line, preliminary and final design. Consortium Italraco of Condotte, Grandi Lavori, Bonifica and ICA (Client: NRC Nigerian Railway Corporation)
Nigeria | ICA/TEAM Group
2.175 m. Railway Bridge over Niger river , preliminary and final design. Consortium Italraco of Condotte, Grandi Lavori, Bonifica and ICA – Contractor Berger & Bilfinger (Client: NRC Nigerian Railway Corporation)
Nigeria | ICA/TEAM Group
53 Km Railway Itakpe-Ajaokuta oreline for iron minerals transportation from the quarries to the steel plant in Ajaokuta, design and supervision. Contractor Berger & Bilfinger (Client: NIOMC – Okene Kwara State)
Nigeria | ICA/TEAM Group
Design of Tin Can Island rail link 45 Km lenght, including all the facilities necessary to integrate the Lagos port complex to the Railways system (Client: N.R.C. Nigerian Railways Corporation)
Nigeria | ICA/TEAM Group
Design and Tender documents of 190 Km Sokoto State Roads: three state roads (Binji-Kwara, Binji-Gulmo, Gidan Madi-Massalachi) with single carriage and width 11,60 m. (Client: Sokoto State Government)
Nigeria | ICA/TEAM Group
Design and Tender documents of 144 Km Bauchi State Roads: two state roads (Katagum-Gololo, Dukka-Nafada) with single carriageway and width 11,60 m. (Client: Bauchi State Government)
Nigeria | ICA/TEAM Group
Design, Tender documents and bid evaluation of 105 Km Makurdi-Okaba Road: urban road in the first stretch (5 Km long) double carriage way with 22,5 m width and in the remaining stretch single carriage with 11,60 m. width (Client: Federal Ministry of Planning)
Nigeria | ICA/TEAM Group
Design, Tender documents and supervision of works of 267 Km Niger State Roads: seven state roads (Shiroro-Gurmana, Gulu-Yewuni, Lapai-Baro, Kuta-Zumba, Gwada-Gwumana, Pandogari-Alowa, Gurmana-Alowa) with single carriage and width 11,60 m. (Client: Niger State Government)
Nigeria | ICA/TEAM Group
Planning and Engineering design of Usuman Irrigation Project, the Project area is 2,500 ha and the irrigation system is by gravity from a 200,000,000 cu.m dam (Client: Niger River Basin Authority)
Nigeria | ICA/TEAM Group
Preliminary and Final design of Upper Gurara River Basin Irrigation Project, the Project area is 10,000 ha and the irrigation system is by gravity from an earth dam (Client: Niger River Basin Authority)
Nigeria | ICA/TEAM Group